HY as a Die Casting PWR Housing manufacturing factory. In a die-cast pressurized water reactor housing, the reactor core heats the water and maintains it under pressure to prevent it from turning into steam. This hot radioactive water flows through tubes in the steam generator.
What is the production process of HY as a manufacturing factory for die-cast Die Casting PWR Housing?
1. When receiving an inquiry, first review the customer's product part design, 2D drawings and quality standards.
2. Then start mold and tooling design and manufacturing
3. After production is completed, mold and tooling testing and sample confirmation
4. After the sample is correct, die-cast the blank casting
5. According to customer's surface treatment requirements: trimming, deburring, polishing, cleaning, passivation and powder coating
6. Precision processing: CNC lathes, milling machines, drilling machines, grinders, etc.
7. Test report, heat treatment report
8. Packing, shipping in wooden boxes or pallets
9. Contact freight forwarding and logistics to inquire and choose the safest and most efficient transportation method.
1. OEM and ODM.
2. Quick quotation within 7-24 hours.
3. Free samples.
4. SGS inspection services or any other inspection specified by the customer.
5. Free transportation service within China.
6.1-year bao'xi after-sales service.